Irrigation System Pumping Station Avancamerasida Water Cylinder Disposal Device
Keywords:
operation, pump unit, vane chamber, water intake chamber, guide element, technical solution.Abstract
The main goal of the research is to develop constructive measures to ensure even distribution of water in the pre-chamber of irrigation system pumping stations and water intake structures, and to improve hydraulic conditions when supplying water to pumps. The authors developed a technical solution that includes an element that affects the movement of water in front of suction pipes. This ensures stable, cavitation-free operation of pumps, prevents expensive and complicated reconstruction of pumping stations, and ensures reliable water supply of pumping stations.